Our Team:
SES
Consulting Inc. has appreciably reduced energy costs and improved building
operations for the following large facilities:
|
Robson
Square Energy Projects
and Continuous Commissioning
(Vancouver)
|
DDC
Upgrade and Optimization
Variable Speed Drive Installation
Chilled Water Storage Tank Optimization
Pressurization Control Optimization
Variable Volume Pumping Optimization
Steam Heating Optimization
Free Cooling Optimization
Web Based Energy Monitoring and Training
DDC Load Shedding using Real Time Energy
High Efficiency Boiler Installation
|
|
Telus
William Farrell Building
Re-Commissioning Projects
(Vancouver)
|
DDC
Upgrade and Optimization
Chiller Staging Optimization
Pressurization Control Optimization
Pumping Optimization
Steam Heating Optimization
Free Cooling Optimization
DDC Energy Monitoring and Training
Domestic Hot Water Optimization
|
|
Kamloops
Courthouse (Kamloops)
|
Metric
Lighting Upgrade
|
|
Fraser
Regional Correctional Centre
(Maple Ridge)
|
Lighting
RFP Documents
DDC Upgrade
Demand Ventilation Optimization
Variable Speed Drive Installation
|
|
City
of Abbotsford
Recreation Centres
(Abbotsford)
|
Various
Lighting Upgrades
Motion Sensor Lighting Controls
Major DDC Upgrade
Pool pumping Optimization
Ice Tempering Optimization
Solar Domestic Water Heating
Web Based Energy Monitoring and Training
High Efficiency Boiler Installation
Heat Reclaim System Installation
Low E-Ceiling Upgrade
|
|
YWCA
Hotel Energy Projects
and Re-commissioning
(Vancouver)
|
DDC
Upgrade and Optimization
Terminal Heat Pump (2 pipe) Optimization
Make Up Air System Optimization
Steam Heating Optimization
Sempa Hybrid Heating Installation
Solar Domestic Water Heating
NRCAN Eco-Energy Incentives
|
|
ARC
Office Building Energy Projects
and Re-Commissioning
(Victoria)
|
25
W T8 Lighting Re-lamp
Motion Sensor Lighting Controls
Instantaneous Domestic Water heaters
Summer Heating Optimization
Demand Ventilation Optimization
|